Winner
VEGO CONCEPT ENGINEERING S.R.L., REFLEX DESIGN & CONSULTING S.R.L., VEGO DESIGN EXPERTISE
Awarded value: €92,617,578
| Winner | VEGO CONCEPT ENGINEERING S.R.L., REFLEX DESIGN & CONSULTING S.R.L., VEGO DESIGN EXPERTISE |
| Awarded value | €92,617,578 |
| Contracting authority | SECTOR 3 (PRIMARIA SECTOR 3 BUCURESTI) |
| Country | Romania |
| Sector | Engineering |
| CPV codes | 71300000, 71300000 |
| Award published | 2026-06-22 |
This contract award notice was published on TED Europa, the EU's official procurement journal. Contract Award Notices (CANs) disclose the winning supplier and value, making them a key source of competitive intelligence on who wins public contracts and at what price. To monitor live opportunities in this sector, browse open EU tenders.
View the official notice on TED Europa →
Related awards
France – Organisation of architectural design contests – Concours de maîtrise d'oeuvre pour la restructuration du groupe scolaire des Allues
France · Engineering · won by sarl BQ+A
Spain – Consultative engineering and construction services – ASISTENCIA TECNICA PARA LA DIRECCION FACULTATIVA, COORDINACION DE SEGURIDAD Y SALUD Y CONTROL AMBIENTAL EN LAS ACTUACIONES DE EMERGENCIA EN EL DOMINIO PÚBLICO HIDRÁULICO. PROVINCIA DE MÁLAGA. FASE 2ª.
Spain · Engineering · won by ISBN74, S.L.
Romania – Various medicinal products – DIVERSE MEDICAMENTE 23 LOTURI
Romania · Medical · won by ND PHARMA S.R.L.
Czechia – Architectural, construction, engineering and inspection services – VZ 29.26 Zpracování projektové dokumentace „Promenáda Dr. Martínka“
Czech Republic · Engineering
Romania – Radar spare parts and accessories – Acord-cadru de furnizare piese de schimb pentru cinemometrul tip AUTOVISION BEE III
Romania · Communications · won by DALIRO
Romania – Bridge renewal construction work – Lucrari de intretinere curenta poduri, pasaje, podete, tuneluri, intretinere ziduri de sprijin si prevenirea efectelor inundatiilor - DRDP-Constanta – Lot 1- Sectia Autostrazi, Lot 2-SDN Constanta, Lot 3-SDN Tulcea, Lot 4- SDN Calarasi, Lot 5 –SDN Slobozia, Lot 6 – SDN Fetesti - Acord Cadru 4 ani -DRDP Constanta
Romania · Construction · won by SC. CONSTRUCTII GENERALE OLTENIA .SRL